Installation of two systems of 7.5kWh and two systems of 5kWh, using lithium batteries in Njengang, Allalie and Nebere(October and November 2024)

Installation of two systems of 7.5kWh and two systems of 5kWh all using lithium batteries in Njengang, Allalie and Nebere all in the month of October and November 2024