Second phase Installation of a 30kWh backup system using Lithium-ion battery in Ngoya, Yaounde, in January 2024. Sponsored by BEGECA
Second phase Installation of a 30kWh backup system using Lithium-ion battery at the Theologate House (CIFA (Communauté Internationale de Formation en Afrique)) in Ngoya Yaounde in September 2024. Sponsored by BEGECA